Call us today! 361.222.1226 |

 Epic Energy Team Projects Services Brochure | This email address is being protected from spambots. You need JavaScript enabled to view it. 

regulatory

EPIC MANAGEMENT TEAM PROJECTS

  • Construction of approximately 5,100 feet of 24 inch crude pipeline and related facilities for Martin Midstream near the Corpus Christi Ship Channel.
  • Construction and installation of two (2) dual 6 inch coriolis meter stations for Copano Energy near Markham, Texas.
  • Construction of 10 miles of 10 inch hydrogen pipeline for MarkWest Energy through the congested Port of Corpus Christi industrial complex.
  • Installation of a 3,400 feet of 6 inch HDD across a wetland area for EOG Resources near Portland, Texas.
  • Decommissioning and abandoning of approximately 300 miles of the Rattlesnake 12 inch pipeline for Koch Pipeline.
  • Installation of 11 miles of 8 inch NGL pipeline in Prestonburg, Kentucky for MarkWest Energy.
  • Construction of 28 miles of 10 inch sour gas pipeline near Campbellton, Texas.
  • Integrity replacements on approximately 9 miles of 12 inch refined products pipeline for NuStar Energy near Refugio, Texas.
  • Conversion of approximately 35 miles of 12 inch refined products pipeline to natural gas near Fort Worth, Texas for Energy Transfer.
  • Multiple miles of various sized gathering lines, both steel and HDPE in west Texas
  • Compressor stations
  • Multiple pipeline modification projects within facilities

 

brochure banner graphic

image007

IMG 0255

image019

image020

EPICHeadquarters
6397 Hwy 77  
Odem, Texas 78370